What we do

When the new Olympic sized pool was built at Swansea, the old University pool became redundant. the pool was infilled  with polystyrene to form the base for a new concrete slab. The hall was then converted to a modern leisure club. A platform lift was also installed from ground to first floor.


Client. Swansea University

QS Faithful & Gould

Architect. Limbrick Associates

Structural Engineer. Atkins

arrow_upward